| When | Run | Above usual | Sent to |
Energy per measured run
facility kWh, in the order the runs finished
Landauer gap over time
energy per operation ÷ physical minimum · log scale · lower is better
Measured with joulesCalculator estimate
| Finished | Project | Run | Hardware | Time | Energy | CO₂ | Gap | |
Energy is what each machine's own meters report: NVIDIA, AMD and Intel GPUs, Intel and AMD CPUs with memory, or on a Mac the Apple chip (CPU, GPU and Neural Engine). Screens, disks and power-supply losses are not included; --pue adds a building's cooling and losses. Runs marked simulated are not measurements. Accuracy and limits →